SpiritOfChennai.com

170ACT : Madhavaram B.S. – C.M.B.T.

This Bus runs between MADHAVARAM B.S. and C.M.B.T. which is a distance of
17.7 kilometers (km).

BUS ROUTE

1) C.M.B.T.
2) Koyambedu School
3) Thirumangalam
4) Wheels India Rd.Jn.
5) Water Pipe Thanthankuppam
6) Malligai Nagar Ave
7) Bus Bay-17Th Km
8) Madhavaram

Expect a Bus Every 30 minutes

DELAY ADVISORY: The average peak time speed on this route is only 18 kmph. Also this route has some road work and other construction activity going on. So plan accordingly!

OPERATING SCHEDULE/ TIMETABLE / TIMING

FROM Madhavaram B.S.
FIRST BUS: 5 AM and then every 30 minutes

FROM C.M.B.T.
FIRST BUS: 5AM and then every 30 minutes

ROUTE MAP

BUS DRIVERS / CONDUCTORS IN THIS ROUTE

Exit mobile version