The Villivakkam Lake Restoration Project is a water body restoration and adaptation project undertaken by Chennai Smart City Limited and Storm Water Drain Department, Greater Chennai Corporation.

Location and Context

The Villivakkam Lake is located in Zone 8 (Anna Nagar) of Greater Chennai Corporation. Villivakkam is situated between the industrial estates Ambattur, Padi, ICF, Perambur Loco Works, this place is populated mostly by the working-class people of Chennai. Over the years, SIDCO Industrial Estate and SIDCO Nagar have come up right on the banks and occupies around 20 acres of tank area. The Present area of the tank is about 36.34 acres of which CMWSSB will owns 11.5 acres and the rest 24.84 is with the GCC.

PARTICULARS UNIT
Total  Area 36.32 acres
CMWSSB Land 11.5 acres
Water Spread area 23.55 acres
(95321.53sq.m)
Average depth of water 3.50 m
Holding capacity 0.07M.cum
Full Tank Level +8.500
Deepest Level +4.000
Inlet level near burial ground +7.000
Outlet at TVS canal +8.500
Debris and Desilting Quantity (for 23.55 acres) 88,000 cum
(32,000 + 56,000)
Formation of Foreshore Bund 15,000 cum
Villivakkam Lake Restoration

The Challenge of Villivakkam Tank

In 2005 floods, most of the water drained into the lake does not cause major problems. Due to the dumping of Metro Rail construction debris, Tank inlets and out has been blocked and this prevented rainwater and excess floodwater from being stored in it, resulting in the flooding of SIDCO Nagar for about 15 days during 2015 flood. Even at present, stormwater drains in the area are completely choked up with silt, garbage, and debris in many places.

Debris from Metro Construction dumped in Vilivakkam Lake

Satellite Image – Past & Present

The satellite image of Villivakkam will show contrasting status between 2001 and 2018.

Villivakkam Lake – Google Satellite Image – 2001 & 2017

Linkages to Villivakkam Lake

The inflow into Villivakkam tank is from Korattur Eri via TVS Canal. The outlet from the lake is to Otteri Nallah. The path of the outlet drain is connected to the Kumarasamy canal.

Environmental & Social Issues

Pollution Check

The restoration project involves keeping water quality sensors to check sewage intrusion.

Point Sources of Pollution

Non – Point Sources of Pollution

The ground water condition in the area is:

The surface water sample results are:

Based on these conditions on the ground the SWD department came up with the design to serve as a high-quality public space that will also serve as a local adaptation project.

Villivakkam Lake Proposed Design

Components of the Proposed Design

Components of the Proposed Villivakkam Lake Project

According to the new design:

The area allocated for the various components are:

S.NO Land Use Area(Sqm)
1 Water spread area 73447.21
2 Parking 2330.24
3 Oat 5611.65
4 Entrance plaza 242.62
6 Scatting ring 298.27
7 Food court 100.00
8 Back entry 242.60
9 Basketball court 385.75
10 Maze 554.29
11 Tunnel 166.48
12 Multipurpose lawn 505.99
13 Kids play 720.00
14 Outdoor gym 386.65
15 Toilet 18.00
16 Walkers pathway and Bund 17017.58
17 Green space 882.39
  Total 102909.72
18 Formation of New Road along TVS Canal 5000.00
  Grand Total 107909.72

The project is expected to be completed by End of 2019. Once completed the project will no doubt be one of the best Urban Space developments in India.

Technical Advice by BARC

The Villivakkam Lake Restoration will also actively see the involvement of one of the premier Indian science institutions namely the Bhabha Atomic Research Center.

As a pilot project, Chennai Corporation will use BARC’s hybrid granular sequencing batch reactor for wastewater recycling and blend it into the lake. The 5-million liters a day (5 MLD) capacity sewage treatment plant near the lake would be upgraded with advanced technology. The recycled wastewater would be released into the lake. This would make the water body perennial and lead to an increase in the groundwater table in the surrounding areas.

The Hybrid Granular SBR Treatment (GST) is a compact biological treatment method for effective removal of contaminants from domestic and industrial wastewaters. It makes use of the natural microbes present in the wastewater for removing contaminants. The microbial growth is predominantly in bio-beads comprising of biomass particles (biofilms and granules). Bio-beads (i) achieve high biomass levels, (ii) simplify separation of biomass from treated wastewater and (iii) decrease the load of pollutants to acceptable levels. The bio-beads produced during wastewater treatment are a source of C, N and P and a fertilizer-supplement in organic farming. The value of the resources recovered from wastewater treatment plants i.e. treated wastewater and fertilizer-supplement, can partly recover the OPEX. The GST uses the unique features of the sequencing batch reactor (SBR) and bio-beads for treating wastewater in a single tank system without secondary clarifiers. It enables building compact effluent and sewage treatment plants with smaller land footprint and lower costs as compared to other methods. This process does not involve chemical addition for removing nutrients & provides odor-free sewage treatment plants.