Waterfly Technologies, a start-up incubated at IIT Madras, plans to take its electric “flying boat” out to sea for the first time, with trials between Chennai and Puducherry before the end of December 2026. Until now the craft has only been tested on Kaveripakkam Lake in Ranipet district.
The numbers
Year Waterfly was founded
Target for first ocean trials
Reported seed funding
Rough Chennai–Puducherry coastal distance
What is a flying boat here
Waterfly describes its craft as sea-skimming: it flies just above the water’s surface rather than at aircraft altitudes. Craft of this kind usually ride on a cushion of air trapped between their wings and the water, which cuts drag and lets them travel far faster than a boat on less energy than a plane. Waterfly has not said publicly whether its design uses this wing-in-ground effect, and has not published speed, range, battery size or seating.
The company is led by co-founder and CEO Harish Rajesh, according to a report on idrw.org on 17 October 2026, and is part of the IIT Madras incubation network.
From lake to sea
Lake tests let a team check stability and control on calm, fresh water. The sea brings waves, wind, salt corrosion and other vessels. The Chennai–Puducherry run along the East Coast is a natural test route: busy on land along ECR, but with no quick passenger link by water today.
Public figures so far on speed, range, passenger capacity or fares. The planned trials are a technical step, not a passenger service.
The rules question
Any commercial service would need approvals from maritime and possibly aviation regulators. Wing-in-ground craft sit between the two and are treated as ships under international maritime guidelines. Waterfly has not said what approvals it has sought.
| Item | Known |
|---|---|
| Company | Waterfly Technologies, IIT Madras-incubated |
| Founded | 2024 |
| Tests so far | Kaveripakkam Lake |
| Next step | Ocean trials, Chennai–Puducherry, by end-December |
| Speed, range, seats | Not disclosed |
Source: idrw.org, 17 October 2026
What this means for you
- Do not expect a passenger service soon; this is an early sea trial.
- Fishers and boat operators along the ECR coast may see test runs in December.
- An electric craft on this route could one day offer a fast, quiet link between the two cities.
- Watch for safety and regulatory details before any service is announced.
What to watch
December 2026
Whether the sea trials take place and what the company reports.
2027
Performance figures, regulatory route and new funding.
Checked against published reports on 16 November 2026. Trial dates may change.
